A module must fit more than the nominal tank size. Internal braces, openings, overflow boxes, inlets, outlets, lighting, viewing sides, substrate depth, and the installation path all shape the final geometry.
Verified internal dimensions
Hydraulic clearance
Viewing and lighting direction
Installation and removal path
02
Workshop assembly and transport
Large scenes can be divided into indexed sections for packing and site assembly. Connection points, handling zones, protective packaging, and the final visual joins are planned before production rather than improvised after delivery.
Module split and numbering plan
Dry-fit review
Protected packing zones
Installation sequence and reference images
03
Maintenance remains part of the composition
The scenery should not obstruct filtration flow or routine service. Removable elements and defined clearances support glass cleaning, debris removal, equipment inspection, and future replacement.
Cleaning access
Debris collection control
Pump and intake clearance
Replaceable decorative elements
Buyer questions
Frequently asked questions
Can a modular aquascape fit a customer-supplied aquarium?
Yes, when verified internal measurements, openings, braces, equipment positions, and installation access are supplied before design approval.
Are the plants live or artificial?
ANMERTON modular aquascapes use artificial plants unless a written project specification explicitly states another scope.
How are large aquascapes shipped?
Large compositions can be divided into numbered, protected sections. The module split, packing method, handling points, and installation order are confirmed for the destination and access conditions.